INSTALLATION
Prior to the finished product leaving our facility, C & S Glass Co creates a comprehensive installation strategy that accounts for unique site conditions, schedule requirements, safety, and quality concerns.
Pre-fabricated components are delivered as close as possible to the installation date to allow them to be installed shortly after arrival in order to avoid high value items from being in the laydown yard for an extended period of time or taking up floor space in congested worksites. Assembled units are lifted by crane or aerial lift equipment and anchored in place to the structure of the building based on designed engineered connection points.